Norcros Adhesives has been involved in a successful refurb of Milverton Hall, an imposing country mansion near Leamington Spa, which has recently been restored to an impressively luxurious standard.
The building comprises eight spacious flats and two coach houses, separate from the main building, combining classic exteriors with contemporary internal comfort. The tiled areas, with which Norcros Adhesives was involved, totalled 1,100m² and were quite complex due to the age of the building and the uneven nature of the floors. A floating acoustic floor was involved, which had quite a lot of movement and required considerable bracing prior to tiling.
The deflection in the floor was the major challenge. Working with the main contractor, Trendgrey, and the tiling contractor, Cladding Components, Norcros Adhesives was able to fix the problem by using Norcros Pro Ply Board and S1 adhesive.
Due to the complex nature of the project, Norcros Adhesives prepared a full M40 specification for Cladding Components, whom they have also worked with successfully on previous projects.
The porcelain tiles on the ground and first floors were fixed with Norcros Rapid Grey S1 Tile Adhesive, while Norcros 4 into 1 Wall & Floor Tile Grout and Norcros Permalayer Anti-Fracture Matting were also used.
Wall tiles were a mix of porcelain and mosaic, fixed with Norcros One Part Flexible Tile Adhesive. All adhesives were supplied by Trinity Tiles.
Norcros Adhesives, Harewood Street, Tunstall, Stoke-on-Trent, ST6 5JZ
- 01782 524140
- www.norcros-adhesives.com